
Terms & Conditions

Current Promotions
14kW GENERATOR PROMOTION October 9 – February 28, 2026 PROMOTION DETAILS: Fully Installed 14kW Generac Home Standby Generator Standard Transfer Switch – 200 amp (can swap out if needed for 100 amp or 16-circuit) 3” Concrete Pad Standard Battery Installation Includes Up to 25 feet of Electrical Wiring and Up to 25 feet of Galvanized Gas Piping Lifetime Warranty DOES NOT INCLUDE: Permits Municipal fees Taxes Package price – $11,926.33 (or $89/month with Synchrony Financing + downpayment of $4,826) PROGRAM LAUNCH DATE: October 10, 2025 PROGRAM END DATE: February 28, 2026 Adams has additional generator models and financing options available to achieve your unique needs. TERMS AND CONDITIONS: FINANCING TERMS AND CONDITIONS BELOW BASED ON $11,926.33 TOTAL PURCHASE – 4,826 DOWN $ 7,100.33 FINANCED $89/month* Interest will be charged on the promo purchase from the purchase date at a reduced 9.99% APR, and fixed monthly payments of $89 are required for 132 months after a non-financed $4,826 down payment. Total payments from amount financed are $11,715.54. These payments are equal to 1.25% of initial total promo purchase amount, rounded up to the next whole dollar. These payments may be higher than the payments that would be required if this purchase was a non-promo purchase. During the last month(s) of the promo period the required monthly payment may be reduced due to the prior months’ rounding. Regular account terms apply to non-promo purchases. New Accounts as of 08/29/25: Purchase APR 26.99%. Min Interest Charge $2. One-time Account Activation Fee of $29 charged at time first purchase posts to account. Existing cardholders: See your credit card agreement terms. Subject to credit approval.
Generator Maintenance Memberships
Plan Enrollment and Payment – Membership plans can be paid monthly or annually based upon customer’s payment selection. New membership payment plans will begin upon enrollment in one of the membership options. Failure to pay may result in suspension or termination of services. Fees are non-refundable once services have been rendered. Service Scheduling – Customers will be given advance notice of upcoming annual maintenance. Adams’ goal is to complete annual generator maintenance within 90 days of the customer’s original installation date. Customers will be notified of any needed scheduled work. Scope of Services – Services listed under each option (e.g., oil change, spark plug replacement, inspection) will be provided during the annual maintenance visit. Any additional repairs, parts, or required labor, outside of the standard maintenance inspection and work outlined above, will be billed separately. Advanced and Premium Features – Remote monitoring/enrollment within our Fleet Program requires compatible technology and is subject to system availability and/or connectivity. Battery replacements will be completed by a technician during annual maintenance. Additional accessories can be purchased separately and will be discussed with homeowners before adding and installing those additional accessories. Ultimate Care Guarantee** – Priority booking and service benefits are based upon selected membership plan and do not guarantee immediate availability during peak times. Within our Ultimate Care Plan and in the event of a generator failure, Adams will either cover hotel accommodation (room rate only – no coverage for incidentals, food, beverages or parking) or provide temporary portable power solutions. This guarantee is valid only for generators serviced and maintained according to the membership terms. Exclusions – Plans do not cover damage or issues caused by improper use, neglect, third-party repairs, or extreme weather events. Adams Generator Maintenance Membership Plans do not cover standby generator installation, fuel-related issues, or modifications beyond regular maintenance. Cancellation Policy – Annual Payment Option: Upon cancellation, Adams will issue a refund for the unused portion of the membership. Customer will receive 90% of the remaining pro-rated amount, minus any benefits (like discounts or maintenance) at current standard rates that customer has already received. Monthly Payment Option: Customer is responsible for the value of any benefits (discounts or maintenance) received at current standard rates, less 90% of payments processed or the remaining balance of the membership—whichever is lower. If credit card on file is unable to be processed, customer will be invoiced for the remaining balance of the membership. Additional Cancellation Considerations: If a customer in the Advanced Care or Ultimate Care Membership Plan cancels their membership within two years of their first payment and has already received a battery replacement as part of their annual maintenance, they will be responsible for paying the full current price of the battery, along with the installation fee. Plan Renewals – Membership will automatically renew each year and the credit card on file will be charged for the renewal. If customer elects to pay annually and does not have a credit card on file, customer will be sent an invoice 30 days prior to renewal period. Preventive Maintenance – Each membership plan includes one generator inspection per membership period. Preventive maintenance will be scheduled Monday through Friday, between 7am and 4pm. Plan Modifications – Adams reserves the right to modify plan details, pricing, and terms with 30 days prior notice to members. Liability Disclaimer – Adams is not liable for damages, losses, or inconveniences arising from generator failure due to factors outside the scope of annual maintenance. Customer Responsibility – Members must ensure generator accessibility for maintenance visits and report issues promptly for resolution. Members may change their annual membership level annually. In addition, generator customers must follow the manufacturer’s suggested maintenance to maintain generator warranty/warranties.